๐Ÿ‘‰https://www.astrocade.com/games/iron-vanguard/01KGKJAPQBR55WEZV9RKTRPSFV?sharedB...

This is a Tank Fight Endless Game . Iron-vanguard is a fast-paced endless action game where you control a battle tank and survive for as long as possible. Enemies keep coming endlessly, testing your movement, aiming, and reaction skills.

The game features both First-Person and Third-Person camera modes, allowing players to switch perspectives and experience the battlefield in different ways. Power-ups appear during gameplay, giving temporary boosts and helping you survive longer in intense tank battles.

Smooth controls, continuous combat, and endless enemies make this game all about skill and survival.

Controls

  • Up Arrow โ€“ Move Forward

  • Down Arrow โ€“ Move Backward

  • Left Arrow โ€“ Turn Left

  • Right Arrow โ€“ Turn Right

  • Right Shift โ€“ Dash

  • Spacebar โ€“ Shoot / Fire

Features

  • Endless tank combat

  • First-Person and Third-Person modes

  • Power-ups for enhanced gameplay

  • Fast movement and dash ability

  • Simple controls, challenging survival


๐Ÿ‘‰https://www.astrocade.com/games/iron-vanguard/01KGKJAPQBR55WEZV9RKTRPSFV?sharedB...

Leave a comment

Log in with itch.io to leave a comment.